How to adjust Buyout costs: Difference between revisions
Jump to navigation
Jump to search
(Created page with "... {{editor location|function values}} {{Editor steps|title=... | |}} ==See also== * How to adjust ") |
No edit summary |
||
Line 1: | Line 1: | ||
... | The Buy Out fee are the costs involved with the relocation of inhabitants, when demolishing a structure that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area. | ||
[[File:Buyout_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | |||
{{editor location|function values}} | {{editor location|function values}} | ||
{{Editor steps|title= | {{Editor steps|title=How to adjust Demolition Costs | ||
| | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |||
|By double clicking on the value the Buyout Cost can be adjusted | |||
|}} | |}} | ||
==See also== | ==See also== | ||
* [[How to adjust ]] | * [[How to adjust ]] |
Revision as of 09:10, 22 September 2020
The Buy Out fee are the costs involved with the relocation of inhabitants, when demolishing a structure that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- By double clicking on the value the Buyout Cost can be adjusted