Construction finish date (Building Attribute): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
|icon=
|icon=
|attribute=CONSTRUCTION_FINISH_DATE
|attribute=CONSTRUCTION_FINISH_DATE
|unit={{timestamp}}
|unit=milliseconds after epoch
|Function value=
|Function value=
|description=Attribute indicating the date this Building was constructed, in seconds from epoch.}} </onlyinclude>
|description=Attribute indicating the date this Building was constructed, in milliseconds after epoch.}} </onlyinclude>
}}
}}



Latest revision as of 08:14, 13 October 2026

Notes

  • When a new Project is created, when a construction date is identified in a Project Source for a Building, this attribute will be set.
  • The value of this attribute represents the number of milliseconds after the epoch UTC date 01-01-1970 00:00:00.

How-to's