Num trucks (Traffic Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Construction attributes|<onlyinclude>{{#if:{{{content|}}}||
{{Building attributes|<onlyinclude>{{#if:{{{content|}}}||
{{Construction attributes|type=row|group={{{overlay|Traffic}}} Overlay| unit=vehicles/h      | attribute=NUM_TRUCKS    | description=The amount of truck traffic on this road.    }}
{{Building attributes|type=row|group={{{overlay|Traffic}}} Overlay| unit=vehicles/h      | attribute=NUM_TRUCKS    | description=The amount of truck traffic on this road.    }}
}}</onlyinclude>}}
}}</onlyinclude>}}


<onlyinclude>{{#if:{{{content|<noinclude>content</noinclude>}}}|
<onlyinclude>{{#if:{{{content|<noinclude>content</noinclude>}}}|


The value can either by a single value, or an [[Attribute array]] of values. As a single value, this reflects the amount of vehicles per hour at any point of the day. As an [[Attribute array]], it's assumed to be an array of 24 values, each value corresponding to each hour of the day.
The value can be a single figure representing vehicles per [[hours ({{{overlay|Traffic}}} Overlay)|hour]], or an [[Attribute array]] of 24 values, one for [[hours ({{{overlay|Traffic}}} Overlay)|each hour of the day]].


{{article end
{{article end
Line 17: Line 17:
* [[Traffic visualization]]
* [[Traffic visualization]]
* [[{{{overlay|Traffic}}} Overlay]]
* [[{{{overlay|Traffic}}} Overlay]]
* [[Hours ({{{overlay|Traffic}}} Overlay)]]
* [[Trucks per hour (Function Value)]]
* [[Trucks per hour (Function Value)]]
{{{seealso|}}}
{{{seealso|}}}

Latest revision as of 14:22, 8 July 2026

The value can be a single figure representing vehicles per hour, or an Attribute array of 24 values, one for each hour of the day.