How to adjust Buyout costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| (8 intermediate revisions by 3 users not shown) | |||
| Line 1: | Line 1: | ||
The [[ | The [[Buyout cost (Category Value)|Buy Out]] fees are the costs involved with the relocation of residents when demolishing a [[Building|building]] that is not [[Building#Categorization|vacant]]. These costs can have a high impact on planned projects. Adjusting these costs can be done in the [[Function Values Table|Function Values Table]] for each function in the project area. | ||
[[File:Buyout_Cost.JPG|350px|thumb|Adjusting | [[File:Buyout_Cost.JPG|350px|thumb|Adjusting Buyout Costs during a session]] | ||
{{editor location|function values}} | {{editor location|function values}} | ||
{{ | {{howto|title= | ||
|Open Edit Function values | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |Use the bottom scroll bar to navigate to the right | ||
| | |Double-click the value to adjust the Buyout Cost | ||
|}} | |}} | ||
{{article end | |||
|seealso= | |||
*[[Cost]] | *[[Cost]] | ||
}} | |||
[[Category:How-to's]] | |||
Latest revision as of 07:51, 13 November 2026
The Buy Out fees are the costs involved with the relocation of residents when demolishing a building that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Values Table for each function in the project area.
How to adjust Buyout costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Buyout Cost