How to adjust Buyout costs: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| (7 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
The [[ | The [[Buyout cost (Category Value)|Buy Out]] fees are the costs involved with the relocation of residents when demolishing a [[Building|building]] that is not [[Building#Vacancy|vacant]]. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area. | ||
[[File:Buyout_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | [[File:Buyout_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | ||
{{editor location|function values}} | {{editor location|function values}} | ||
| Line 6: | Line 6: | ||
|Open Edit Function values | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |Use the bottom scroll bar to navigate to the right | ||
| | |Double-click the value to adjust the Buyout Cost | ||
|}} | |}} | ||
{{article end | |||
|seealso= | |||
*[[Cost]] | |||
}} | |||
[[Category:How-to's]] | |||
Latest revision as of 09:40, 15 July 2026
The Buy Out fees are the costs involved with the relocation of residents when demolishing a building that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Buyout Cost