How to adjust Buyout costs: Difference between revisions
Jump to navigation
Jump to search
Created page with "... {{editor location|function values}} {{Editor steps|title=... | |}} ==See also== * How to adjust " |
No edit summary |
||
| (10 intermediate revisions by 4 users not shown) | |||
| Line 1: | Line 1: | ||
... | The [[Buyout cost (Category Value)|Buy Out]] fees are the costs involved with the relocation of residents when demolishing a [[Building|building]] that is not [[Building#Vacancy|vacant]]. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area. | ||
[[File:Buyout_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]] | |||
{{editor location|function values}} | {{editor location|function values}} | ||
{{Editor steps|title= | {{Editor steps|title=How to adjust Demolition Costs | ||
| | |Open Edit Function values | ||
|Use the bottom scroll bar to navigate to the right | |||
|Double-click the value to adjust the Buyout Cost | |||
|}} | |}} | ||
{{article end | |||
* [[How to | |seealso= | ||
*[[Cost]] | |||
}} | |||
[[Category:How-to's]] | |||
Latest revision as of 09:40, 15 July 2026
The Buy Out fees are the costs involved with the relocation of residents when demolishing a building that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.
How to How to adjust Demolition Costs:
- Open Edit Function values
- Use the bottom scroll bar to navigate to the right
- Double-click the value to adjust the Buyout Cost