How to adjust Buyout costs: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
Reijn@tygron.com (talk | contribs)
Created page with "... {{editor location|function values}} {{Editor steps|title=... | |}} ==See also== * How to adjust "
 
No edit summary
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
...
The [[Buyout cost (Category Value)|Buy Out]] fees are the costs involved with the relocation of residents when demolishing a [[Building|building]] that is not [[Building#Vacancy|vacant]]. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.
 
[[File:Buyout_Cost.JPG|350px|thumb|Adjusting Demolition Costs during a session]]
{{editor location|function values}}
{{editor location|function values}}


{{Editor steps|title=...
{{Editor steps|title=How to adjust Demolition Costs
|
|Open Edit Function values
|Use the bottom scroll bar to navigate to the right
|Double-click the value to adjust the Buyout Cost
|}}
|}}


==See also==
{{article end
* [[How to adjust ]]
|seealso=
*[[Cost]]
}}
[[Category:How-to's]]

Latest revision as of 09:40, 15 July 2026

The Buy Out fees are the costs involved with the relocation of residents when demolishing a building that is not vacant. These costs can have a high impact on planned projects. Adjusting these costs can be done in the Function Value panel for each structure in the project area.

Adjusting Demolition Costs during a session
Editor → Current Situation (Ribbon tab) → Buildings (Ribbon bar) → Edit Function Values (Dropdown)
How to How to adjust Demolition Costs:
  1. Open Edit Function values
  2. Use the bottom scroll bar to navigate to the right
  3. Double-click the value to adjust the Buyout Cost

See also