How to edit measure cost details: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
[[File:measures-right-cost-concost.jpg|frame|right|The field for the "construction cost".]] | [[File:measures-right-cost-concost.jpg|frame|right|The field for the "construction cost".]] | ||
: ''The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any costs brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | : ''The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any costs brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | ||
:* ''NONE (No additional costs)'' | :* ''NONE (No additional costs)'' | ||
:* ''FIXED (A fixed additonal cost)'' | :* ''FIXED (A fixed additonal cost)'' |
Revision as of 10:50, 13 February 2023
Editor → Future Design (Ribbon tab) → Measures (Ribbon bar) → The Measure to edit (Left panel) → Cost Details (Sub-option)
Construction cost
- The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any costs brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
- NONE (No additional costs)
- FIXED (A fixed additonal cost)
- VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
- You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.