Buyout cost (Function Value): Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{Function values | {{Function values | ||
|<onlyinclude>{{Function | |<onlyinclude>{{Function values|type=row | ||
| | |||
|functionvalue=Buyout cost | |functionvalue=Buyout cost | ||
|attribute=BUYOUT_COST_M2 | |attribute=BUYOUT_COST_M2 |
Revision as of 11:16, 8 October 2020
Function value | Attribute | Unit | Per category | Range | Description |
---|---|---|---|---|---|
Buyout cost | BUYOUT_COST_M2 | currency/m² | Yes | How much it costs, in addition to the demolition costs, to demolish this construction during a session, when the construction is not vacant. These costs are due to eviction or buyout of existing tenants. |
Values
- The default values for this Function Value are based on expert data consulted in past projects, such as the ClimateGame.
- The default values are not overwritten during the creation of a new project.