Version 2019.2.0: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
(Created page with "TODO release notes: * GUI")
 
No edit summary
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
TODO release notes:
Version 2019.2.0 is released on preview.tygron.com (Preview) on Thursday November 29, 2018


* GUI
'''GUI'''
* New Measurement Tool panel to measure Overlay data. Both Point and Line data can be shown.
* New Performance panel shows details how long it takes to recalculate the Overlays, Indicators, etc.
* Redo layout of Editor, focused on the current situation, future and multi stakeholder.
* Only show relevant GUI panels for these three focus areas.
 
'''Performance'''
* Improved performance for large amount of TQL update Queries.
* Improved performance for Grid based TQL Queries.
* Better load sharing between Projects running at the same time.
 
'''Water Overlay'''
* Improved visualisation of Direction Overlay.
* Improved processing time of Wateroverlay with multiple Timeframes.
* Improved handling of Timeframe Overlays in GUI.
* Some small fixes in the groundwater & chemical flow.
 
'''API'''
* Added Documentation for multiple events.
 
'''Known Issues'''
* Future Tab needs extra work (e.g. no Stakeholder selection here).
* Measurement Tool is in Beta and needs more testing.
[[Category:Version 2019]]

Latest revision as of 11:18, 6 May 2019

Version 2019.2.0 is released on preview.tygron.com (Preview) on Thursday November 29, 2018

GUI

  • New Measurement Tool panel to measure Overlay data. Both Point and Line data can be shown.
  • New Performance panel shows details how long it takes to recalculate the Overlays, Indicators, etc.
  • Redo layout of Editor, focused on the current situation, future and multi stakeholder.
  • Only show relevant GUI panels for these three focus areas.

Performance

  • Improved performance for large amount of TQL update Queries.
  • Improved performance for Grid based TQL Queries.
  • Better load sharing between Projects running at the same time.

Water Overlay

  • Improved visualisation of Direction Overlay.
  • Improved processing time of Wateroverlay with multiple Timeframes.
  • Improved handling of Timeframe Overlays in GUI.
  • Some small fixes in the groundwater & chemical flow.

API

  • Added Documentation for multiple events.

Known Issues

  • Future Tab needs extra work (e.g. no Stakeholder selection here).
  • Measurement Tool is in Beta and needs more testing.