Slanting roof height (Function Value): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
mNo edit summary
No edit summary
(5 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Function values table start}}
{{Function values
<onlyinclude>{{Function value
|<onlyinclude>{{Function values|type=row
|icon=
|functionvalue=Slanting roof height
|functionvalue=Slanting roof height
|attribute=SLANTING_ROOF_HEIGHT
|attribute=SLANTING_ROOF_HEIGHT
Line 8: Line 7:
|description=How high the slanting roof at the top of the construction should be visualized at its peak. The roof will slant inwards equally from all sides. This is a visual effect only, but it is possible to reference this value in custom calculations.
|description=How high the slanting roof at the top of the construction should be visualized at its peak. The roof will slant inwards equally from all sides. This is a visual effect only, but it is possible to reference this value in custom calculations.
}}</onlyinclude>
}}</onlyinclude>
{{table end}}
}}


{{Function value details
{{Function value details incomplete
| static=a generic graphical styling.
| static=conductive for a generic graphical styling.
| overwritten=based on [[Project Sources|project sources]].
| overwritten=based on [[Project Sources|AHN]].
| usages=* Waiting times during [[timeline session]]s.
| usages=
| specifics=
| specifics=
| notes=* The slanting roof height is also defined as a property of individual construction sections.
| notes=* The slanting roof height is also defined as a property of individual construction sections.

Revision as of 11:11, 8 October 2020

Values

  • The default values for this Function Value are conductive for a generic graphical styling.
  • Buildings generated during project creation can have their values overwritten based on AHN.

Notes

  • The slanting roof height is also defined as a property of individual construction sections.
  • When the slanting roof height is overwritten during project creation, the overwrite takes place per construction section, rather than for the construction as a whole.