How to configure the Water Overlays

From Tygron Support wiki
Jump to navigation Jump to search
Please note: This page is currently being updated.

This page describes several use cases and examples of configurations in the Flooding Overlay.

Time-controlled flow rate in Breach

Multi Breach Simulation

Show a simulation of a dike breach

Create an in- and outlet