How to configure a dynamic infiltration factor for a Water Overlay: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

30 January 2024

29 January 2024

3 February 2023

24 January 2023

23 January 2023

  • curprev 16:5416:54, 23 January 2023Frank@tygron.nl talk contribs 2,205 bytes +2,205 Created page with "By default, the amount of water that can infiltrate into the unsaturated zone is linear. This page describes how to configured a changing infiltration over time by configuring the infiltration factor s attribute of a Water Overlay. {{Editor location|overlay wizard|The Groundwater Overlay}} {{Editor steps|title=set a dynamic breach height for an existing breach. |Prepare a CSV file with the desired timing data for the ..."