How to adjust the Unit System of a project

From Tygron Support wiki
Revision as of 13:35, 5 March 2026 by Frank@tygron.nl (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The Unit system of a project is normally configured when creating a new project. However, it is also possible to adjust the Unit System for existing projects.

How to adjust the Unit System of a project:
  1. Open the project in the editor.
  2. Select the Tools tab in the ribbon bar.
  3. Click on the API Overview button
  4. Navigate to Events ... EditorSetting ... SET_UNIT_SYSTEM_TYPE
  5. Select the desired Unit System in the choice box
  6. Click on the POST Form button to change the unit system