Drainage formula (Water Overlay)
Revision as of 14:53, 4 December 2020 by Frank@tygron.nl (talk | contribs)
Drainage passive: First the flow capacity is calculated
Failed to parse (MathML with SVG or PNG fallback (recommended for modern browsers and accessibility tools): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle Q_{b} = A_d \cdot f_s \cdot \abs{\frac{(w_g - w_w) \cdot A_w}{A_d \cdot f_s + A_w}}}
is the ground water level in meters
- is the water level in the waterway
- is the drainage datum height in meters.
- is the drainage area size in square meters.
- is the average storage percentage of the ground above the drainage.
- is the amount transfered for a balanced ground and surface water level
- <math>Q_{max} is the amount available in the ground above the drainage.
- <math>