Aerius Module: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
{{Template:Aerius Module buttons}} | {{Template:Aerius Module buttons}} | ||
[[File:nox_result_type.jpeg|thumb|420px|right|Example of the Aerius Overlay NOX result type]]__NOTOC__ | [[File:nox_result_type.jpeg|thumb|420px|right|Example of the Aerius Overlay NOX result type]]__NOTOC__ | ||
The Aerius module calculates NOX and NH3 | The Aerius module calculates NOX and NH3 deposition on Natura 2000 areas by using the [https://connect.aerius.nl/api/doc/ AERIUS Connect Api]. | ||
The Aerius module can be used for the following: | The Aerius module can for example be used for the following scenarios: | ||
* Calculate emissions for | * Calculate the emissions and nitrogen deposition on Natura 2000 areas for a new building, based on the type, size and way of heating of/in the building. | ||
* Calculate | * Calculate emissions and nitrogen deposition on Natura 2000 areas for the construction and usage of new roads, based on the increase of traffic per traffic category and type of road | ||
* Calculate the | * Calculate and visualize the emissions and nitrogen deposition for the different phases (construction phase and usage phase) of a new building plan. | ||
==See Also== | ==See Also== | ||
* [[Aerius (Overlay)|Aerius Overlay]] | * [[Aerius (Overlay)|Aerius Overlay]] |
Revision as of 12:00, 31 August 2020
The Aerius module calculates NOX and NH3 deposition on Natura 2000 areas by using the AERIUS Connect Api. The Aerius module can for example be used for the following scenarios:
- Calculate the emissions and nitrogen deposition on Natura 2000 areas for a new building, based on the type, size and way of heating of/in the building.
- Calculate emissions and nitrogen deposition on Natura 2000 areas for the construction and usage of new roads, based on the increase of traffic per traffic category and type of road
- Calculate and visualize the emissions and nitrogen deposition for the different phases (construction phase and usage phase) of a new building plan.