Wind turbine (Indicator): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Line 2: Line 2:


==General==
==General==
The green MKP Indicator calculates per different type of area a grade based on the amount of green in this area. The allocation of the area determines the calculation of the grade. Each type of area has different parameters for the amount and value of green. For example, an area with mostly industrial buildings is allowed to have less green than a residential area.
The Wind turbine Indicator calculates the amount of wind turbines in the project area and gives the amount of generated power in MW. First the current situation is calculated and compared to the planned situation. By setting a target value it is possible to plan scenario's to experimend in reching a energy goal. For example, the target for the generated power in the project area is 10 MW. This target needs to be reached by planning both large and normal wind turbines in the project area. 
 
This indicator is for example useful for projects in where:
 
*(one of the) goals is to work on reaching a certain green target
*different spatial plans are compared in the 3D world
*the project area should become climate adaptive 
 
The green MKP Indicator belongs to the set of MKP indicators. MKP stands for Environmental Quality Models (MileuKwaliteitsProfielen) and consist of up to 20 indicators to assess the built environment. The MKP and therefore the indicators are created by the Province of Utrecht. Read more about the MKP indicators and the theory behind it on [[MKP_(Indicators)|this page]].


===Indicator panel===
===Indicator panel===

Revision as of 13:09, 3 May 2019

Template:Learned

General

The Wind turbine Indicator calculates the amount of wind turbines in the project area and gives the amount of generated power in MW. First the current situation is calculated and compared to the planned situation. By setting a target value it is possible to plan scenario's to experimend in reching a energy goal. For example, the target for the generated power in the project area is 10 MW. This target needs to be reached by planning both large and normal wind turbines in the project area. 

Indicator panel

The MKP Green indicator.

The indicator panel shows the following information:

  • The amount of current turbines
  • The amount of current large turbines
  • The amount of planned turbines
  • The amount of planned large turbines
  • The total amount of generated power in MW
  • The score per area

Calculation

The indicator calculates the amount of m2 green per area. This is backchecked against the allocation plan per area to calculate the score per area.The following formula is used:
The calculation MKP Green indicator. The calculation of score MKP Green indicator.

Score

The score is represented in a progress bar, with a scale from 0 to 100%. Determine if you want to calculate the absolute or relative score. In general, the more green is present in an area, the higher the score is.

Additional configurations

For this indicator, the area types your project consist of have to be imported or created in the project. For the steps and how to, read the information on the general MKP page.