(Created page with "Breaches can be set to have a dynamic breach height, so that over time the DEM is heightened or lowered. This can allow a breach to appear or worsen at a later point durin...")
 
mNo edit summary
Line 17: Line 17:
File:Breach_2_csv.JPG
File:Breach_2_csv.JPG
</gallery>
</gallery>
===Notes===
When preparing the [[CSV]] files for the breach, if the breach should be "open" from the beginning of the session, the first defined value for the breach height can immediately be a value low enough to allow water to flow in. If the breach should open up during the simulation but start "closed", the first defined value for the breach height should be equal to the [[terrain height]] in the breach's location.

Revision as of 13:55, 15 April 2019

Breaches can be set to have a dynamic breach height, so that over time the DEM is heightened or lowered. This can allow a breach to appear or worsen at a later point during the simulated period. It can also allow a breach to be closed over time, or a levee to appear after a set period.

Template:Editor ribbon

How to set a dynamic breach height for an existing breach.:
  1. Prepare a CSV file with the desired timing data for the breach height.
  2. Open the configuration wizard of the Flooding Overlay.
  3. Continue to the step concerning breaches.
  4. Select the breach the breach height of which should be set dynamically.
  5. Set the breach height's mode to dynamic, and select 'Select'. This will open the CSV importing tool.
  6. Select 'Import new CSV', and select the CSV file with the desired timing data.
  7. Answers the questions related to your data format, so that the file can be interpreted correctly.
  8. The imported values now appear in the CSV importing tool. The CSV importing tool can now be closed.
  9. The configuration wizard of the Flooding Overlay can now also be closed.

Notes

When preparing the CSV files for the breach, if the breach should be "open" from the beginning of the session, the first defined value for the breach height can immediately be a value low enough to allow water to flow in. If the breach should open up during the simulation but start "closed", the first defined value for the breach height should be equal to the terrain height in the breach's location.