Impact flood threshold m (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
|attribute=IMPACT_FLOOD_THRESHOLD_M | |attribute=IMPACT_FLOOD_THRESHOLD_M | ||
|unit=m | |unit=m | ||
|description=The amount of water a construction must experience before it is considered impacted by water. Water must reach this height either on one of the cells the construction is on, or on one of the cells adjacent to it. This is used to compute the | |description=The amount of water a construction must experience before it is considered impacted by water. Water must reach this height either on one of the cells the construction is on, or on one of the cells adjacent to it. This is used to compute the [[Impacted buildings result type (Water Overlay)|IMPACTED_BUILDINGS]] result type. | ||
}} | }} | ||