Ground water depth formula (Subsidence Overlay): Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
(Created page with "The ground water depth has to be calculated for each cell individually and possibly updated for the previous occurred subsidence and water level indexation.")
 
No edit summary
Line 1: Line 1:
The ground water depth has to be calculated for each cell individually and possibly updated for the previous occurred subsidence and water level indexation.
At the start of a simulation, the ground water depth is initialized with the ground water depth geotiff (if provided) and is optionally overwritten by (managed) water level areas' water level.
Furthermore, the ground water level can be managed with [[Drainage object (Subsidence Overlay)|drainages]] (provided as underground buildings), either [[Drainage (Subsidence Overlay)|actively]] or [[Low passive_drainage (Subsidence Overlay)|passively]].
has to be calculated for each cell individually and possibly updated for the previous occurred subsidence and water level indexation.

Revision as of 10:57, 9 February 2021

At the start of a simulation, the ground water depth is initialized with the ground water depth geotiff (if provided) and is optionally overwritten by (managed) water level areas' water level. Furthermore, the ground water level can be managed with drainages (provided as underground buildings), either actively or passively.

has to be calculated for each cell individually and possibly updated for the previous occurred subsidence and water level indexation.