Drainage formula (Water Overlay): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
: <math>f_s</math> is the average storage percentage of the ground above the drainage. | : <math>f_s</math> is the average storage percentage of the ground above the drainage. | ||
: <math>Q_{b}</math> is the amount transfered for a balanced ground and surface water level | : <math>Q_{b}</math> is the amount transfered for a balanced ground and surface water level | ||
: <math>Q_{max} is the amount available in the ground above the drainage. | : <math>Q_{max}<math> is the amount available in the ground above the drainage. | ||
: <math> | : <math>Q_{p_t}</math> is the drainage capacity at time t |
Revision as of 14:55, 4 December 2020
Drainage passive: First the flow capacity is calculated
where:
- is the ground water level in meters
- is the water level in the waterway
- is the drainage datum height in meters.
- is the drainage area size in square meters.
- is the average storage percentage of the ground above the drainage.
- is the amount transfered for a balanced ground and surface water level
- is the drainage capacity at time t