Created page with "Detail level is a project setting that determines at what level of detail the project is created. It can only be set at project creation. Currently there are two modes; Basic and Detailed. Setting a project to non-detailed (Basic Mode) has the following consequences: - Minimum Building size of 10 m2. Smaller Buildings are not added to the project during the Project creation. - Minimal Cell M (5 m) - Max Total Grid Cells - DTM Resolution: Basic (10 m) - Satellite..." |