Trains per hour (Function Value): Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 20: | Line 20: | ||
| notes= | | notes= | ||
| references= | | references= | ||
}} | |||
{{article end | |||
|seealso= | |||
* [[Function Values (Traffic visualization)]] | |||
}} | }} | ||
Latest revision as of 14:04, 29 April 2026
| Function value | Attribute | Unit | Per category | Range | Description |
|---|---|---|---|---|---|
| Trains per hour | NUM_TRAINS | vehicles/h | No | 0 to 1.7976931348623157E308 | How many trains move over the given tracks, per hour. |
This only affects the visualization. Trains are not included in the road-based Traffic Model or Traffic Overlays.