Measure: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
|||
Line 19: | Line 19: | ||
{{Editor steps|title=remove an existing measure|Select "Stakeholders" in the ribbon header.|Select "Measures" in the ribbon bar.|Select the measure you wish to remove.|Select "Remove" in the [[editor#Left_Panel|left panel]].}}<br clear=all> | {{Editor steps|title=remove an existing measure|Select "Stakeholders" in the ribbon header.|Select "Measures" in the ribbon bar.|Select the measure you wish to remove.|Select "Remove" in the [[editor#Left_Panel|left panel]].}}<br clear=all> | ||
===Editing measure properties=== | ===Editing general measure properties=== | ||
{{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure}} | {{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure}} | ||
[[File:Measures-right.jpg|frame|left|The right panel allows you to edit properties.]] | [[File:Measures-right.jpg|frame|left|The right panel allows you to edit properties.]] | ||
Line 48: | Line 48: | ||
: ''The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.''<br clear=right> | : ''The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.''<br clear=right> | ||
===Editing | ===Editing Cost Details=== | ||
{{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Cost Details}} | {{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Cost Details}} | ||
[[File:Measures-right-cost.jpg|frame|left|The right panel allows you to edit properties.]] | [[File:Measures-right-cost.jpg|frame|left|The right panel allows you to edit properties.]] | ||
====Construction Time==== | |||
[[File:measures-right-cost-contime.jpg|frame|right|The field for the "construction time".]] | [[File:measures-right-cost-contime.jpg|frame|right|The field for the "construction time".]] | ||
: ''The construction time in months. This is how long it takes in [[timeline]] projects to perform the measure. You can change this by altering the number in the "construction time" field.''<br clear=right> | : ''The construction time in months. This is how long it takes in [[timeline]] projects to perform the measure. You can change this by altering the number in the "construction time" field.''<br clear=right> | ||
====Demolition Time==== | |||
[[File:measures-right-cost-demotime.jpg|frame|right|The field for the "demolition time".]] | [[File:measures-right-cost-demotime.jpg|frame|right|The field for the "demolition time".]] | ||
: ''The demolition time in months. This is how long it takes in [[timeline]] projects to demolish the measure. You can change this by altering the number in the "demolition time" field.''<br clear=right> | : ''The demolition time in months. This is how long it takes in [[timeline]] projects to demolish the measure. You can change this by altering the number in the "demolition time" field.''<br clear=right> | ||
====Construction cost==== | |||
[[File:measures-right-cost-concost.jpg|frame|right|The field for the "construction cost".]] | [[File:measures-right-cost-concost.jpg|frame|right|The field for the "construction cost".]] | ||
: ''The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | : ''The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | ||
Line 71: | Line 69: | ||
<br clear=right> | <br clear=right> | ||
====Demolition cost==== | |||
[[File:measures-right-cost-democost.jpg|frame|right|The field for the "demolition cost".]] | [[File:measures-right-cost-democost.jpg|frame|right|The field for the "demolition cost".]] | ||
: ''The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | : ''The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | ||
Line 80: | Line 78: | ||
<br clear=right> | <br clear=right> | ||
====Fixed Water Storage==== | |||
[[File:measures-right-cost-water.jpg|frame|right|The field for the "water storage".]] | [[File:measures-right-cost-water.jpg|frame|right|The field for the "water storage".]] | ||
: ''The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.'' | : ''The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.'' | ||
<br clear=right> | <br clear=right> | ||
=== | ===Editing Events=== | ||
{{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Events}} | {{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Events}} | ||
[[File:Measures-right-events.jpg|frame|left|The right panel allows you to add and remove events.]] | [[File:Measures-right-events.jpg|frame|left|The right panel allows you to add and remove events.]] | ||
Line 91: | Line 89: | ||
When a measure reaches a certain state (such as being planned, completed, planned for demolition, or demolished), it is possible to trigger one or more [[event]]s. For each state of the measure, a list of events exists. | When a measure reaches a certain state (such as being planned, completed, planned for demolition, or demolished), it is possible to trigger one or more [[event]]s. For each state of the measure, a list of events exists. | ||
====Selecting events==== | |||
[[File:measures-right-events-list.jpg|frame|right|The list of events.]] | [[File:measures-right-events-list.jpg|frame|right|The list of events.]] | ||
: ''The list of events allows you to select any event currently connected to the measure. By changing the state in the dropdown menu, you can switch between the lists of events present for this measure.''<br clear=right> | : ''The list of events allows you to select any event currently connected to the measure. By changing the state in the dropdown menu, you can switch between the lists of events present for this measure.''<br clear=right> | ||
====Adding and removing events events==== | |||
[[File:measures-right-events-buttons.jpg|frame|right|The buttons for adding and removing events.]] | [[File:measures-right-events-buttons.jpg|frame|right|The buttons for adding and removing events.]] | ||
: ''To add an event to the measure, select the state at which you would like the event to trigger, and select either "Add Server Event" or "Add Client Event" to add the appropriate event to the measure. To remove an event, select it in the list and select "Remove".''<br clear=right> | : ''To add an event to the measure, select the state at which you would like the event to trigger, and select either "Add Server Event" or "Add Client Event" to add the appropriate event to the measure. To remove an event, select it in the list and select "Remove".''<br clear=right> | ||
==== | ====Changing events==== | ||
[[File:measures-bottom-events.jpg|frame|right|The bottom panel when editing events.]] | [[File:measures-bottom-events.jpg|frame|right|The bottom panel when editing events.]] | ||
: ''When an event is selected in the right panel, you can edit the properties of the event in the bottom panel. You can change the type of event by selecting the desired event from the list of events. If additional parameters are required, fields for these parameters will appear in the bottom panel as well, and can be filled in as required. When the event has been configured as desired, you can select "Commit" to confirm these changes. If you do press "Commit" before closing the panel, your changes are not changed. You can also press "Cancel" to undo your changes.<br clear=all> | : ''When an event is selected in the right panel, you can edit the properties of the event in the bottom panel. You can change the type of event by selecting the desired event from the list of events. If additional parameters are required, fields for these parameters will appear in the bottom panel as well, and can be filled in as required. When the event has been configured as desired, you can select "Commit" to confirm these changes. If you do press "Commit" before closing the panel, your changes are not changed. You can also press "Cancel" to undo your changes.<br clear=all> | ||
=== | ===Editing Indicator Scores=== | ||
{{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Indicator Scores}} | {{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Indicator Scores}} | ||
[[File:Measures-right-indicators.jpg|frame|left|The right panel allows you to edit properties.]]<br clear=all> | [[File:Measures-right-indicators.jpg|frame|left|The right panel allows you to edit properties.]]<br clear=all> |
Revision as of 12:42, 18 August 2015
This article is a stub.
Please note: This page is currently being updated.
Measures
How measures relate to the Tygron Engine
When to use measures
Creating and editing measures
Creating and removing measures
How to create a new measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select "Add" in the left panel.
How to duplicate an existing measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select an existing measure you wish to duplicate.
- Select "Duplicate" in the left panel.
How to remove an existing measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select the measure you wish to remove.
- Select "Remove" in the left panel.
Editing general measure properties
A measure has many properties that may be adjusted. The measure's general properties can be adjusted when the measure itself is selected in the left panel.
Name
- The name of the measure. This is the name which will appear in a stakeholder's list of actions. Depending on the effects of the measure, it is important to provide a descriptive name. You can change this by altering the text in the text field.
Owner
- The owner of the measure. This is the stakeholder who will be considered the stakeholder performing the measure, if it is not directly enacted via a stakeholder's list of actions. You can change this by selecting a different stakeholder in the dropdown menu.
Image
- The image seen when the measure is selected in a stakeholder's list of actions. A fitting image will help users identify the measure at a glance. You can change this by clicking the image, and selecting a new image in the opened window.
Requires confirmation
- Whether the measure will require confirmation from other stakeholders. If this is the case, when the measure is planned, the appropriate stakeholders (such as the owners of land and buildings, and the municipality) will need to approve the measure via a popup. To change this, check or uncheck the checkbox.
Start automatically on date
- Whether the measure will automatically be performed on a given date. When the checkbox is unchecked, the measure will not be automatically performed. When the checkbox is checked, the measure will automatically be performed when the time in the session reaches the point specified in the textfield. To change this property, check or uncheck the checkbox. To change the date on which to automatically perform the measure, change the date in the text field
Description
- The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.
Editing Cost Details
Construction Time
- The construction time in months. This is how long it takes in timeline projects to perform the measure. You can change this by altering the number in the "construction time" field.
Demolition Time
- The demolition time in months. This is how long it takes in timeline projects to demolish the measure. You can change this by altering the number in the "demolition time" field.
Construction cost
- The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
- NONE (No additional costs)
- FIXED (A fixed additonal cost)
- VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
- You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.
Demolition cost
- The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
- NONE (No additional costs)
- FIXED (A fixed additonal cost)
- VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
- You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.
Fixed Water Storage
- The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.
Editing Events
When a measure reaches a certain state (such as being planned, completed, planned for demolition, or demolished), it is possible to trigger one or more events. For each state of the measure, a list of events exists.
Selecting events
- The list of events allows you to select any event currently connected to the measure. By changing the state in the dropdown menu, you can switch between the lists of events present for this measure.
Adding and removing events events
- To add an event to the measure, select the state at which you would like the event to trigger, and select either "Add Server Event" or "Add Client Event" to add the appropriate event to the measure. To remove an event, select it in the list and select "Remove".
Changing events
- When an event is selected in the right panel, you can edit the properties of the event in the bottom panel. You can change the type of event by selecting the desired event from the list of events. If additional parameters are required, fields for these parameters will appear in the bottom panel as well, and can be filled in as required. When the event has been configured as desired, you can select "Commit" to confirm these changes. If you do press "Commit" before closing the panel, your changes are not changed. You can also press "Cancel" to undo your changes.
Editing Indicator Scores