Measure: Difference between revisions
Jump to navigation
Jump to search
m (→Cost Details) |
m (→Cost Details) |
||
Line 52: | Line 52: | ||
====Cost Details==== | ====Cost Details==== | ||
{{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Cost Details}} | {{Editor ribbon|header=Stakeholders|bar=Measures|left=Measure|Cost Details}} | ||
[[File:Measures-right-cost.jpg|frame|left|The right panel allows you to edit properties.]]<br clear= | [[File:Measures-right-cost.jpg|frame|left|The right panel allows you to edit properties.]] | ||
====Construction Time==== | |||
[[File:measures-right-cost-contime.jpg|frame|right|The field for the "construction time".]] | |||
: ''The construction time in months. This is how long it takes in [[timeline]] projects to perform the measure. You can change this by altering the number in the "construction time" field.''<br clear=right> | |||
====Demolition Time==== | |||
[[File:measures-right-cost-demotime.jpg|frame|right|The field for the "demolition time".]] | |||
: ''The demolition time in months. This is how long it takes in [[timeline]] projects to demolish the measure. You can change this by altering the number in the "demolition time" field.''<br clear=right> | |||
====Construction cost==== | |||
[[File:measures-right-cost-concost.jpg|frame|right|The field for the "construction cost".]] | |||
: ''The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | |||
:* ''NONE (No additional costs)'' | |||
:* ''FIXED (A fixed additonal cost)'' | |||
:* ''VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)'' | |||
: ''You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.'' | |||
<br clear=right> | |||
====Demolition cost==== | |||
[[File:measures-right-cost-democost.jpg|frame|right|The field for the "demolition cost".]] | |||
: ''The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:'' | |||
:* ''NONE (No additional costs)'' | |||
:* ''FIXED (A fixed additonal cost)'' | |||
:* ''VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)'' | |||
: ''You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.'' | |||
<br clear=right> | |||
====Fixed Water Storage==== | |||
[[File:measures-right-cost-water.jpg|frame|right|The field for the "water storage".]] | |||
: ''The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.'' | |||
<br clear=right> | |||
====Events==== | ====Events==== |
Revision as of 12:01, 18 August 2015
This article is a stub.
Please note: This page is currently being updated.
Measures
How measures relate to the Tygron Engine
When to use measures
Creating and editing measures
Creating and removing measures
How to create a new measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select "Add" in the left panel.
How to duplicate an existing measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select an existing measure you wish to duplicate.
- Select "Duplicate" in the left panel.
How to remove an existing measure:
- Select "Stakeholders" in the ribbon header.
- Select "Measures" in the ribbon bar.
- Select the measure you wish to remove.
- Select "Remove" in the left panel.
Editing measure properties
A measure has many properties that may be adjusted. The measure's general properties can be adjusted when the measure itself is selected in the left panel.
Name
- The name of the measure. This is the name which will appear in a stakeholder's list of actions. Depending on the effects of the measure, it is important to provide a descriptive name. You can change this by altering the text in the text field.
Owner
- The owner of the measure. This is the stakeholder who will be considered the stakeholder performing the measure, if it is not directly enacted via a stakeholder's list of actions. You can change this by selecting a different stakeholder in the dropdown menu.
Image
- The image seen when the measure is selected in a stakeholder's list of actions. A fitting image will help users identify the measure at a glance. You can change this by clicking the image, and selecting a new image in the opened window.
Requires confirmation
- Whether the measure will require confirmation from other stakeholders. If this is the case, when the measure is planned, the appropriate stakeholders (such as the owners of land and buildings, and the municipality) will need to approve the measure via a popup. To change this, check or uncheck the checkbox.
Start automatically on date
- Whether the measure will automatically be performed on a given date. When the checkbox is unchecked, the measure will not be automatically performed. When the checkbox is checked, the measure will automatically be performed when the time in the session reaches the point specified in the textfield. To change this property, check or uncheck the checkbox. To change the date on which to automatically perform the measure, change the date in the text field
Description
- The description of the measure. This will also appear in a stakeholder's list of actions when the measure is selected. In addition to the name, a good description can be necessary to convey the intent and effect of the measure. You can change this by altering the text in the text area.
Editing additional measure properties
In addition to the general properties of the measure, there are also a number of specific properties which can be edited.
Cost Details
Construction Time
- The construction time in months. This is how long it takes in timeline projects to perform the measure. You can change this by altering the number in the "construction time" field.
Demolition Time
- The demolition time in months. This is how long it takes in timeline projects to demolish the measure. You can change this by altering the number in the "demolition time" field.
Construction cost
- The construction cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is enacted. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
- NONE (No additional costs)
- FIXED (A fixed additonal cost)
- VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
- You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.
Demolition cost
- The demolition cost. This is the impact the measure will have on the enacting stakeholder's budget when the measure is demolished. This cost is in addition to any cost brought forth by spatial aspects of the measure, such as the placement of buildings. The cost type can be set to the following values:
- NONE (No additional costs)
- FIXED (A fixed additonal cost)
- VOLUME (An additional cost based on the area/volume of the spatial aspects of the measure)
- You can change this by selecting the desired cost type using the dropdown, and entering or changing the number in the field below it.
Fixed Water Storage
- The amount of water storage this measure provides for the area. You can change this by altering the number in the "Fixed water storage" field field below it.
Events
Indicator Scores