Multi Scenario: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
{{learned|how the Multi stakeholder tab relates to the {{software}}|the general layout of the Multi stakeholder tab|what options are available through the Multi stakeholder tab?}}
==How does the Multi stakeholder tab relate to the {{software}}==
The Multi stakeholder tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design a story for a multi-stakeholder analyses. This consists of managing stakeholders, designing story with levels, a timeline and messages and project explanation with intro tests and interface options.
The Multi stakeholder tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design a story for a multi-stakeholder analyses. This consists of managing stakeholders, designing story with levels, a timeline and messages and project explanation with intro tests and interface options.
[[File:Q1-2016-EditorPanel.jpg|thumb|400px|left|The editor. The Multi stakeholders tab is located in the ribbon bar at the top of the editor.]]
[[File:Q1-2016-EditorPanel.jpg|thumb|400px|left|The editor. The Multi stakeholders tab is located in the ribbon bar at the top of the editor.]]

Revision as of 15:43, 4 October 2022

The Multi stakeholder tab is the third of the four ribbon tabs and is located in the top part of the editor. The Multi Stakeholder tab contains the options to design a story for a multi-stakeholder analyses. This consists of managing stakeholders, designing story with levels, a timeline and messages and project explanation with intro tests and interface options.

The editor. The Multi stakeholders tab is located in the ribbon bar at the top of the editor.


Multi Stakeholder

Editor ribbon header multistakeholder.jpg