Uitgangspunten falen keringen template: Difference between revisions

From Tygron Support wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 7: Line 7:
* Culverts in (the to be) inundated area
* Culverts in (the to be) inundated area
* Initial water level in (the to be) inundated area
* Initial water level in (the to be) inundated area
===Breach area====
===Culverts====
===Water depth====

Revision as of 08:16, 13 January 2020

General

The manual describes the steps that need to be taken to quickly and in an efficient manner create a new project with multiple flooding scenarios. The following settings/presence of data influences the accuracy and outcome of the calculation (in order of importance):

  • The size of the breach
  • The upstream water level of the breach
  • Capacity of water body upstream breach (how quickly does the water level lower as a result of the breach?)
  • Grid size
  • Culverts in (the to be) inundated area
  • Initial water level in (the to be) inundated area

Breach area=

Culverts=

Water depth=