Construction finish date (Building Attribute): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 October 2023

1 March 2023

  • curprev 14:0614:06, 1 March 2023Frank@tygron.nl talk contribs 415 bytes +415 Created page with "{{building attributes | <onlyinclude> {{building attributes |type=row |icon= |attribute=CONSTRUCTION_FINISH_DATE |unit={{timestamp}} |Function value= |description=Attribute indicating the date this Building was constructions, in seconds from epoch.}} </onlyinclude> }} When a new Project is created, when a construction date is identified in a Project Source for a Building, this attribute will be set."